This project consisted of environmental remediation and demolition of the entire Cardinal Creek housing community. Environmental remediation and demolition were required due to the 500-unit housing complex being located dangerously close between two different airports, according to the FAA.
Highway 40/I-64 Demolition – St. Louis, MO
We completed environmental remediation prior to demolition of homes impacted by this major highway expansion project.
Marquette Building – St. Louis, MO
Midwest Service Group was called on to complete the asbestos abatement and lead-based paint stabilization on all 23 stories pluse 3 basements of the Marquette Building to make way for the revitalization of this downtown St. Louis high rise. This rapidly dilapidating building was abated of all its environmental concerns and left ready for re-construction.
Dominion Kincaid Power Plant – Kincaid, IL
Dominion Kincaid utilizes Midwest for asbestos and lead-based paint abatement on scheduled shut downs of plant operations and all 24 hour a day emergency response projects. Midwest is not only responsible for the removal and cleanup, but performs the mechanical re-insulation of thermal system works through a subsidary, Central Mechanical Insulation.
Parkway School District – St. Louis, MO
Midwest’s reliable service and its ability to meet multiple aggressive schedules set by contractors were key components in being awarded this three-year term T&M contract for asbestos abatement. The Parkway School District Facilities Department oversees the maintenence of approximately 45 schools and properties. Midwest is on call 24 hours a day to provide emergency environmental […]
Federal Maximum Security Prison – Terre Haute, IN
Midwest Service Group performed asbestos abatement in this aging prison. Our scope of work consisted of remediating the tunnels below each cell block and then installing EPDM membrane on the dirt floors of each cell block. Because this prison was in use during our work on the project, Midwest employees were required to enter the […]
University of Missouri – Columbia
Midwest Service Group was contracted to perform the complete asbestos abatement of two dorm buildings (over 50,000+ sq ft) to make way for the construction of the new Patient Care Tower building. This abatement project was completed within the very tight time frame and on budget.
Fort Leonard Wood Training Barracks Upgrade (TBUP)
Midwest Service Group was contracted with multiple general contractors and work closely with the Army COE to perform (to date) all 6 phases of this project. Our SOW on these Training Barrack Upgrade Projects (TBUP) included asbestos / lead-based paint abatement prior to the interior demolition of over 20 (30,000+ sf ft) Barrack Buildings and […]
WUSM Campus Renewal Project
Midwest Service Group was contracted to conduct a high profile asbestos abatement and hazardous waste remediation project for a joint project between BJC and WUSM in the Central West End section of St Louis, MO. This multi million dollar abatement project consist of the complete abatement of 4 buildings to make way for demolition and […]
TPO Training
On April 3rd & 4th, MSG Roofing Division held a TPO training session for 18 new and experienced roofing technicians. Topic covered included standard flashing details, accessories supplied by manufacturers, mechanically attached and fully adhered systems, as well as introducing technicians to newly developed industry production tools and roof systems such as Rhinobond, Accutrac and […]